Skip to main content

How do I quick edit, assign and link work orders on the phone?

On the Colobbo phone app: quick edit a work order, assign it, add and view linked work orders, add BOM lines, and draw or move a job's shape on the map.

On the Colobbo phone app you can quick edit a work order, assign it, add linked (child) work orders, add bill of materials (BOM) lines, and draw or move the job's shape on the map. Some of these are only for admins and dispatchers. Each section below says who can use it.

To start, open a job from the Work Order tab, or use the ⋮ button on a job card in the list.

Quick edit a work order

Who can use it: admins and dispatchers who can edit work orders. Technicians and subcontractor admins don't see it.

Phone app: tap the three dots on a job card, choose Quick edit, change Lot / Address 2 and tap Save
  1. In the work order list, tap ⋮ on the job's card, then tap Quick edit.

  2. Tap the field you want to change: Work order code, Due date, Address, Lot / Address 2, or Reference name (linked work orders only).

  3. Make the change and tap Save under that field. Each field saves on its own, and you see a message such as Due date updated.

The work order code can't be left empty. Archived work orders can't be quick edited.

Assign a work order, or change who has it

Who can use it: anyone who can edit work orders, except technicians. Subcontractor admins can choose a person, but the company is set by their company.

Phone app: tap Change in the job header, pick a person and tap Save assignment
  1. Tap Assign on the job's card, or Change if someone already has it. The same button is in the job's header, next to the technician.

  2. Pick a person in Assign to and, if needed, a Company. Picking a person fills in their company. You can also choose Unassigned.

  3. If the job has linked work orders, turn on Include linked child work orders to give them the same person and company.

  4. Tap Save assignment. You see Assigned to and the person's name.

  • You need to be online to assign. Offline, the button is greyed out.

  • If a claim has been submitted for the job, you see Assignee can't be changed.

  • A warning shows if no one has the skills the job needs, or if a person's skill has expired.

Add linked work orders

Who can use it: anyone who can open the job. You need to be online.

Phone app: tap +, choose Add Linked WO, pick MDU - Building, add the reference name Building A and tap Submit
  1. Open the job and go to the Linked WO tab, then tap +. Or, on the Info tab, tap + and choose Add Linked WO.

  2. Choose the Work Order Type.

  3. Enter the Number of Child Work Orders (1 to 25).

  4. Type a Reference Name for each one if you want to. Reference names are optional.

  5. Tap Submit.

The new work orders appear on the Linked WO tab. No message confirms it, so check the tab after you submit.

See all linked work orders

On the Linked WO tab, tap View all. Search by code, asset, address or technician, and pull down to refresh. Tap a work order to open it. Close the list with the X.

Phone app: the Linked WO tab lists the linked work orders; View all opens the full list with search

Add or edit a BOM line

Who can use it: only admins can add a BOM line. Anyone who can open the job can open a line to edit it, but what they can change depends on their role.

  1. Open the job and go to the BOM tab.

  2. To add a line, tap + (admins only). To change a line, tap ⋮ on it and choose Edit.

  3. Pick the Description (required) and fill in the quantities. Variation and amounts are worked out for you.

  4. Tap Submit. You see BOM details saved successfully.

  • Admins can change the description, original quantity and approved quantity.

  • Technicians can change the claim quantity only, and don't see rates or amounts.

  • Everyone can add a comment with Add comments.

Draw or move the job's shape on the map

Some jobs have a shape on the map, such as a point or a line for a duct. You can redraw it or move it. You need to be online.

Draw a new shape

  1. Open the job, go to the Info tab, tap + and choose New Geo.

  2. Choose a snap distance if you want one (No Snap, 0.5 m, 1 m or 5 m), then draw on the map. The length shows as Distance.

  3. Tap Save, then Save again to confirm. The new shape replaces the old one.

  4. To leave without saving, tap Cancel, then Don't Save.

After saving you may see Updated Checklist Successfully. This means the shape was saved.

Move the shape

  1. On the Info tab, tap + and choose Geo-Move.

  2. Tap Geo Move and drag the shape, or tap Delete Vertex to remove a corner of a line.

  3. Tap Save, then Save again to confirm.

Add a new duct or pit from the Map

If your company uses the Map page, it's in the bottom tabs or on the More page.

  1. On the Map, open Add at the top and choose Install New Duct or Install New Pit, then tap +.

  2. Draw it on the map and tap CREATE, then Save.

  3. Fill in the form that opens. Questions marked as required say This field is mandatory until answered.

  4. Tap Save and confirm. The map reloads with the new item.

Tap an item on the Map to see its card, with Update, Delete (new items only) and Close.

Frequently asked questions

Why can't I see Quick edit or Assign?

Your role doesn't allow it. Technicians can't quick edit or assign work orders. Ask your admin.

Why is there no Map tab?

Your company hasn't turned the Map on for your role. Ask your admin.

Can I do this on the web too?

Related

Did this answer your question?