An action is a task someone needs to do, such as fixing a defect or following up with a customer. To create one, open Actions from the side menu, select + New, type a title and select Create Action.

You can also set a priority, a due date, assignees, tags, links and custom fields, and move the action through four statuses: To Do, In Progress, Completed and Closed. Each step below has a short moving picture. The examples use a sample action called TEST – Cracked drain cover (help article).

How do I create an action?

On the Actions list, New is selected and a blank action opens on the right
  1. Open Actions from the side menu. The Actions list opens.

  2. Select + New at the top right. A blank action opens in a panel on the right.

The blank action panel with Status To Do, Title, Description, Priority Medium, Due date, Assignees, Tags, Linked items and Custom Fields

The blank action. Title is the only field you must fill in. The chip at the top right shows A-0 until the action is saved. Then it shows the action number.

How do I add a title and a description?

A title and a description are typed into the new action
  1. Type a short name in Title. It is required and can be up to 200 characters. If you leave it empty, Colobbo says Title is required.

  2. Add what needs doing in Description. This is optional and can be up to 2,000 characters.

How do I set the priority and the due date?

High priority is chosen and the due date changes to match

Choose Low, Medium or High in Priority. A new action starts at Medium. When you choose a priority on a new action, Colobbo fills in Due date for you. It adds the number of days saved for that priority to today's date (see "How do I set the number of days for each priority?" below). In our sample company that is 2 days for High, 3 for Medium and 5 for Low.

The new action panel with Priority High and the due date two days ahead

High priority, and the due date it set.

If your company has not saved any days, the due date stays empty until you pick one. You can also type or pick a date yourself at any time.

How do I change the priority of an action I already made?

The sample action is clicked in the list and opens on the right

Click the action in the Actions list to open it. It opens in the same panel, now showing its number (here A-45088), with an Activity tab next to Details.

The priority is changed to Low and the due date stays the same

Choose a new Priority. The due date does not move. Only a new action gets a date from its priority, so on an existing action set the date yourself if the new priority needs a different one.

An existing action saves by itself about two seconds after each change. The note at the top of the panel says so, and the chip shows Saving while it works. There is no Save button to press.

How do I pick a different due date on an action I already made?

On an open action, the calendar is opened and a new due date is picked

Select the date box and type a date as day, month, year (for example 10/11/2026), or select the calendar icon and click a day. The new date saves by itself. On a new action, type the date or pick it the same way before you select Create Action.

The open action showing its tag, linked work order, custom fields, Update Action button and who created and last edited it

An open action. The foot of the panel shows who created it and who last edited it.

Changing the days in Action Settings does not change actions that already exist.

How do I assign people to an action?

Add Assignees is selected, a name is searched for and ticked
  1. Select Add Assignees.

  2. Type part of a name in Search Assignees and tick each person.

  3. Press Escape, or click away, to close the list.

The action panel with two assignees shown, each with a small bin icon

Two assignees on the action.

Each name has a bin icon to remove that person, and the icon at the end of the row clears everyone. Colobbo notifies people when they are assigned, both when you create the action and when you add someone new later.

If you can only view actions, not create or edit them, Title, Description, Priority and Due date are read-only and the people already on the action cannot be removed.

How do I add tags?

The Tags box is opened and a tag is chosen

Open Tags and tick one or more from your list. Tags are saved when the action is created, and they show beside the title in the list.

How do I link an action to a work order, site or template?

New Link is selected, a work order is found and ticked
  1. In Linked items, select + New Link. The Link Action box opens.

  2. Choose Templates, Work Order or Site on the left. (Some screens still call a site a Work Package.)

  3. Search, tick the record and select Save.

The Link Action box with one work order ticked, marked New

A work order ticked in Link Action. Select Save to keep it.

On a new action the links are held until you select Create Action. On an existing action they are saved at once. Use the arrow at the right of Linked items to hide or show the list.

How do I fill in custom fields?

The General group of custom fields is opened and values are typed

If your organisation has set up custom fields for actions, they appear under Custom Fields in groups. Select a group to open it, then fill in the fields. A field marked with a red star is required. If one is empty, Colobbo will not save the action and tells you to complete all required custom fields. If there are none, the panel says no custom fields are set up.

The open General group with the AA, general label and dropdown fields

The custom fields in our sample company: a number, a text box and a drop-down.

How do I save the action?

Create Action is selected and the new action appears in the list

Select Create Action. The panel closes and the action appears in the list. It is saved as To Do unless you chose another status first. This is how the sample looked once it had a tag, a link and two assignees.

The finished action form with two assignees, a tag, a linked work order and custom fields filled in before saving

The finished form, ready to save.

The Actions list showing the new action with its tag, High priority, due date, assignees, linked work order and To Do status

The new action in the list: number, priority, due date, assignees, linked work order, tag and status.

What do the statuses mean, and how do I change one?

Status

Use it when

To Do

Nobody has started. A new action starts here.

In Progress

Someone is working on it.

Completed

The work is done. Colobbo records the date and shows it in the list ("Completed on") and at the foot of the action.

Closed

The action is finished with. It shows a green Closed status in the list.

The status list is opened and In Progress is chosen

Open the action, select the Status at the top and choose a new one. The change saves by itself.

The Status list showing To Do, In Progress, Completed and Closed

The four statuses. On our test company you can move between them in any order.

What is the difference between Completed and Closed?

Completed is chosen; the status shows Completed and the action is saved

Completed means the work is done. Choose it and Colobbo records the date it was completed: the tile then says "Completed on" with that date, and the foot of the open action shows a Completed line.

Closed is chosen

Closed is the last status. In the list it shows a green Closed chip.

The sample action in the list with a Closed status

A closed action in the list.

Who can close an action?

On our test company, anyone who can edit actions saw all four statuses and could pick Closed. We found no rule that limits Closed to one role. If your organisation has set up a status flow, the list shows only the steps allowed from where the action is now, and a move that is not allowed is refused with a message.

How do I set the number of days for each priority?

The gear icon is selected and Action Settings opens
  1. On the Actions list, select the gear icon at the top right. You only see it if you can edit actions.

  2. Enter whole numbers of days for High, Medium and Low priority deadlines (In days). All three are required, and decimals are not accepted.

  3. Select Save Settings.

Action Settings with the days for High, Medium and Low priority

Action Settings. In our sample company: High 2 days, Medium 3, Low 5.

These numbers apply to the whole company. They only set the date when someone picks a priority on a new action.

How do I create an action from a work order or a site?

An action made from a record is linked to it automatically.

  • From a work order: open the work order, select the round + button beside Download, and choose Action.

  • From a site: open the site, select the round + (Create New) button at the top right and choose Action.

  • From an inspection: an inspection template can create an action when an answer needs follow-up. See the inspection template article.

A work order with the plus menu open showing Boots On Ground, Add Linked WO, Action and Inspection

The plus menu on a work order. Choose Action.

A site with the Create New menu open showing Work Order, Inspection and Action

The Create New menu on a site. Choose Action.

Choosing Action opens the same blank action panel as before, already tied to that record. These two steps have pictures rather than moving pictures, because the work order and site screens show details that a recording cannot hide. The Actions tab on a site or work order lists the actions linked to it. A work order's tab also includes actions from its child work orders.

How do I find and filter actions?

The view switch is used to change from Tile to Grid

Use Tile for one action per row and Grid for a sortable table with a column for each detail. In the tile, the three-dot menu has Edit and, if you may delete, Delete. Tick a row, or Select All, to select actions. Select the three-dot menu on a row, then Delete, and confirm; a message says the action was deleted. If you do not have permission to delete, the Delete option is not there. The download icon opens a box to export the list as CSV or Excel, with extra columns such as Days Open.

The Actions grid with columns for ID, Title, Description, Priority, Due Date, Assignees and Status

Grid view.

Filters is opened and Add filter lists what you can filter by

Type in Search actions to find an action by title, description or number (A-123 or 123). For more control, select Filters, then + Add filter, and choose what to filter by: Title, Description, Due Date, Completion Date, Status, Days Open, Inspections, Work Orders, Work Packages (the old name for Sites), Created Date, Modified Date, Tags, a custom field, Priority, Assignees, Templates or Created By. If nothing matches, the list says No actions were found.

Edit Columns (beside Clone View, above the list) lets you choose which columns the view shows. An action is overdue when its due date has passed and it is still To Do or In Progress; filter on Due Date to find them.

The Add filter list

The list of things you can filter by. The list scrolls, so the first ones are shown here.

How do I save my filters as a view?

Select Add view, then Create new view, give it a name and keep it Private (or share it with your team or everyone). Add your filters, then select the save icon at the right of the filter row. The view then shows as a pill above the list, and Colobbo opens it next time. Our sample view is called TEST – Drain cover (help article) and filters the title to "drain cover".

The Actions list with a saved view called TEST – Drain cover and a Title contains drain cover filter

A saved view with a Title filter.

How do I repeat an action on a schedule?

Schedules is selected and the action schedules page opens

Select Schedules beside the view switch. The page has Schedules and Upcoming tabs, filters for Open, Overdue, Paused, Stopped and All, and a + New schedule button. Make a schedule and Colobbo creates an action for each date. The Schedules button only shows where schedules are turned on. The full steps are in How to repeat Work Orders, Inspections and Actions on a schedule.

The Actions Schedules page with tabs and the New schedule button

The Schedules page.

Related articles

FAQ

Why didn't the due date change when I changed the priority?

Only a new action takes its due date from the priority. On an existing action, change the date yourself.

Why can't I change the title or priority?

Those fields are read-only if you do not have permission to create or edit actions. Ask an administrator.

Where do I see actions for a site?

Open the site and go to its Actions tab. It has a switch for Linked to Site and Linked to Work Orders.

What makes an action overdue?

Its due date has passed and it is still To Do or In Progress. Completed and Closed actions are not overdue.

Why can't I see the gear icon?

Action Settings is only shown to people who can edit actions. Ask an administrator.

How do I delete an action?

Use the three-dot menu on its row and choose Delete, then confirm. You need permission to delete actions.

Did my change save?

On an existing action, yes: it saves about two seconds after you change a field. A new action is saved when you select Create Action.

Can I move an action back from Closed?

On our test company, yes: the Status list of a Closed action still shows all four statuses. If your organisation uses a status flow, Closed may be the last step.