A project is the container for your work. It has one customer, its own currency and rate card, and its own settings for scheduling, milestones, records of conversation, reports and expressions of interest. Set up each project before you add sites and work orders to it.
Who can do this: an admin who can open Projects in Settings.
Before you start
The customer must already exist. Customers are added under Settings > CRM.
Rate cards must already exist if you want to attach one.
Find your projects
Click the gear icon at the top right to open Settings, then go to Projects.
The list shows each project's Project Name, Created date, Last Updated date and Status.
Use the Active and Inactive switch to filter the list, or use Search projects to find a name.
Create a project
Click NEW.
On the Project Settings tab, enter the Project Name. It is required.
Pick a Currency.
Set the Status. It starts as Active.
Choose the Customer. This is required.
Optionally, pick a Rate Card.
Under Sites, decide on Allow duplicate site names. It is ticked by default. When it is off, sites within this project must have unique names.
Click Save & Next. Back and Cancel are beside it.
The Create Project form. Project Name and Customer are required.
The tabs after Project Settings are greyed out on a new project.
Before you save, every tab after Project Settings is locked.
Open an existing project
Click a project's name in the list. The page shows the project's name at the top, with Back, Cancel and Save Project buttons. All six tabs are open: Project Settings, Scheduler Settings, Milestones, ROC Settings, Report Settings and EOI Settings.
An existing project. The Save Project button replaces Save & Next.
The project tabs
Scheduler Settings has a Terms & Conditions section and a Privacy Policy section. Each has an Ask tick box, a caption and a text box. For the full scheduler set-up, see How to set up the Resource Planner (admin).
The Scheduler Settings tab.
Milestones is headed Project Milestones, with Active and Inactive views, a Search milestones box, an Enable Milestones tick, a Link Milestone button and a NEW button.
The Milestones tab. A project with none shows "No milestones found for this project."
ROC Settings, Report Settings and EOI Settings have their own articles:
Custom fields for sites, work orders and actions are on the Project Settings tab, under the Sites setting. Each has its own tab: Site, Work Order and Action. The Site tab starts with a General group, and a Rule Based Fields section sits below.
Related articles
FAQ
Why can't I save a project without a customer?
The customer is required. Pick one from the Customer list, or add the customer under Settings > CRM first.
What happens if I turn off Allow duplicate site names?
Every site in the project must have a name no other site in the project uses.
Why are the tabs greyed out?
You are on a new project that has not been saved. An existing project opens with every tab available.




